§ 01 / Weather Log

The rain passes. The context stays.

Log observed conditions, add notes and photos, and connect them to the job day. The history remains available for internal review.

Report weather

—
—
—
§ 02

What is a construction weather log?

A weather log records conditions observed on site on a specific date. The site lead can select rain, wind, snow or another condition and add notes and photos alongside the day’s activity.

  • Observed conditions and recording date
  • Notes and photos linked to the day
  • History available with the job
§ 03

The problem: delays that look like your fault

001

Rain in November, dispute in March

Five months later, you are asked to reconstruct a delay. You remember two weeks of rain, but notes and photos are not linked to the dates and affected work.

002

Photos without dates or context

A photo of mud alone does not explain the day. You need to know where it was taken, what work was planned and what was observed.

003

Stoppages that never make it into the minutes

The freezing day or the windy one happened, but nobody wrote it in the works log. For the client, it never existed.

§ 04

The difference: weather in the context of the work

001

Conditions observed on site

The site lead selects the condition actually observed.

002

Operational context

Add a note and photos where useful.

003

Dated history

Review observations with the job’s other recorded activity.

CUSTOMER STORY
“You don't have to wait until month-end for everyone to hand in their reports: it's much more immediate.”
Matteo Armand — Senior admin / surveyor, Alpi Scavi srl
Read the full story →
§ 05

How it works

001

Observe

Select the condition observed on site.

002

Describe

Add the date, note and useful photos.

003

Review

Find the entry in the job history.

EVIDENCE

What archim handles, what you verify

archim

What archim organises

  • Observations sit alongside the day’s hours, work and notes.
  • Find the entry when you need to reconstruct the working conditions.
your team

What your team reviews

  • Record what you observed on site and the work affected.
  • Link notes and photos to the date; assess any contractual effects separately.
§ 06

FAQ

From the site lead recording observed conditions. archim does not present them as certified measurements.

Yes. Select the observed condition and describe its effect on work in the note. Notes may include manually observed readings, for example rain >5 mm/h, wind >50 km/h or temperature <5°C, with their measurement context. These are not official thresholds or automatic work-stoppage triggers.

Yes. Notes and photos stay with the date and job.

It documents what was recorded. Contractual or legal weight should be assessed with your advisers.

The site lead indicates observed conditions in the day record.

Record the date, observed condition, affected work, notes and available photos. The company assesses contractual effects.

No. The site lead confirms observed conditions so the history reflects what was seen on site.
§ 09

Every site day has a story, weather included

See how observed conditions, notes and photos sit alongside the work recorded on the same date in the demo.

✓ Guided setup ✓ Dedicated support ✓ Clear annual pricing